Typically there are three primary team members on a design/build project. They include the Owner, the criteria developer, and the design/build (D/B) contractor. Each one is explained in more detail below:

1. Owner

•  Work with criteria developer to capture needs and desires in criteria documents/contract documents
•  Implement a process to select D/B contractor
•  Work with D/B contractor to finalize design and construction (sometimes through criteria developer/project manager)
•  Communicate changing needs to D/B contractor
•  Participate in punch list process
•  Move in and enjoy the new facility

2. Criteria Developer

•  Work with Owner personnel and stakeholders to draft criteria documents/contract documents
•  Sometimes hired to represent the Owner throughout construction and review design/construction/completion activities
•  May review pay applications and change orders and assist Owner in the punch list process
•  Advise Owner on contractual matters and D/B contractor compliance with contract
•  Assist Owner to maintain budget integrity

3. Design/Build Contractor 

•  Provide qualifications proposal and initial renderings to demonstrate their vision of compliance with the criteria documents
•  Confirm pricing with subcontractors that meets design criteria
•  Provide scope compliance information and agree on cost with Owner
•  Design the project using qualified design professionals and obtain Owner approval of code- compliant design that meets the criteria documents
•  Design team maintains engagement in project throughout construction
•  Construct the project, draft changes, punch out and complete the facility
•  Maintain budget and schedule throughout the duration of the project
•  Provide clear and regular communication with Owner on project status and any changes
•  Obtain good reference from satisfied Owner

So, why should an Owner select design/build?

  1. Single source of accountability – this goes for design and construction
  2. Budget management – discussing budget throughout the duration of design
  3. Enhanced communication – early and ongoing communications between Owner, design contractor, and subcontractor(s)
  4. Faster project completion – can shorten overall schedule since construction starts while design is being completed

If you have more questions or want to get started on your next project with us, reach out!